Power grid restored.
The power company expects the power to be back at 03.22 local time.
An outage on the power grid is causing the datacenter to run on backup power.
No services affected and staff on site.
We’ll find your subscription and send you a link to login to manage your preferences.
We’ve found your existing subscription and have emailed you a secure link to manage your preferences.
We’ll use your email to save your preferences so you can update them later.
Subscribe to other services using the bell icon on the subscribe button on the status page.
You’ll no long receive any status updates from Glesys Status, are you sure?
{{ error }}
We’ll no longer send you any status updates about Glesys Status.